LED making machines pcb etching machine pick n place smt feeder chmt48va desktop smt feeder
Dimensions | 940mm(L)×710mm(W)×340mm(H) |
Weight | 39kg |
Power Supply |
AC220V (50Hz, single phase) /AC110V (60Hz, single phase); 300W |
Air Supply | No external air supply required |
Vacuum Generation | Built-in vacuum pump |
Mounting Head Quantity | 2 |
Mounting Speed |
6000cph(optimal without vision detection); 4000cph (optimal with vision detection) |
Control Accuracy | 0.025mm |
Component Type |
0402/0603~5050/SOT/SOP/QFP/QFN/BGA, etc. (resistor/capacitor/diode/triode/LED/IC, etc.) |
PCB Thickness | 0.6mm~3.5mm |
PCB Size | 10mm(L)×10mm(W)~345mm(L)×360mm(W) |
PCB Conveying | Manual operation |
Nozzle Change | Manual operation |
Control System |
Built-in computer (embedded Linux operating system), 7-inch touch screen |
Drive System | X&Y-axis driven by stepping motors in the way of closed-loop control realized by encoder; Z-axis capable of reset detection;all motors adopting flexible S-curve acceleration and deceleration; tape puller automatic reset supported |
Transmission System | Synchronous belt+polished rod |
Feeding System | 29 tape feeding stacks(8mm:22,12mm:4,16mm:2,24mm:1;customization supported), 14 preset general IC stacks, work surface custom IC trays and stick feeder supported |
Vision System | Up-looking camera for component automatic calibration (component size applicable: 22mm×22mm); down-looking camera for PCB calibration via Mark Point and component positioning |
FAQ:
Q: How is the training?
A: After buying our machines, your engineers can go to our company or it is so easy to operate the machine according the training video and user manual, the user manual will come with the machine together.
Q:Is it hard to use these machines?
A: No, not hard at all For our previous clients, just about 2 days for learning operation
Q:Are machines can meet software update?
A:YES, we will update machine and will send you at first time
Q:Do you have any operation videos to watch?
A:We provide customers with special operation videos. If you don't understand anything, you can contact us and will arrange engineers to shoot the specified videos.
Q: What kind of maintenance is needed?
A: Add lubricating oil to the guide rail, let the water drain away which from the oil-water separator, and clean the nozzle (we
will support this oil)
Contact Us at Any Time